| Living-room, kitchen: flooring imported granite plaster;
walls and ceiling plaster ground coat with latex paint.
Bedrooms: flooring oak parquet; walls and ceiling plaster
ground coat with latex paint.
Lobby and corridor: flooring imported terracotta tiles;
walls and ceiling plaster ground coat with latex paint.
Bathroom with WC and WC: flooring imported terracotta tiles;
walls up to 2.20m and imported faience; ceilings fine sprayed
plaster; fixed Bulgarian make (Ideal Standard) toilet seats,
sinks, bidet, normal tubs or shower cabins according to the
design.
Joinery: facade: white plastic three chamber with German
profile glass form 24mm with white float glass and German
lining; inside doors plywood covered; entrance door armoured,
produced by Solid Company.
Heating and Ventilation: Italian aluminium radiators, horizontal
connections with polyethylene pipes, collector box, vertical
taps from five-ply polyethylene pipes, ensured gas heating
and installed gas rate-meter at each real estate property.
Water Supply and Sewerage System: completely executed from
polyethylene water supply pipes, normal conditions Bulgarian
produce pipes and shower taps with ceramic heads (Ideal Standard
produce) in all hygiene premises.
Power Supply Installation: Power and low current installation
lamp outlets with three wire cable complete with imported
switches and sockets, imported apartment electricity installation
boards. Security system, Telephone system, Antenna system
and Grounding system according to the working design.
Basement: flooring cement mortar; walls and ceiling ordinary
plaster; door metal with combination lock.
Furnishing a kitchen with kitchen cupboards and built-in
household appliances: a dishwasher, refrigerator, absorber,
hot-plates, oven, and washing machine.
A possibility for fully furnishing the real estate property
in accordance with a project approved by the client, against
additional payment.
GARAGE: flooring mosaic; walls and ceiling ground coat,
small sink, garage door, BERRI type one-axis opening, import
from Germany, complete with remote control.
Common part of the building fully completed according to
the design.
· Entrance and staircase: flooring granite and sand plaster;
rail with powder paint; walls and ceiling gypsy ground
coat and latex paint.
· Facade with cover-all heat insulation and hydro-resistance
decorative coat.
· Roof heat and hydro-insulation with bardoline coating
or a coating of similar quality.
· External supply of the building: in accordance with the
requirement of the Regulation for state acceptance and operation
of construction sites in the Republic of Bulgaria.
· Vertical setting-out: As per design.
The following services shall be provided in the housing complex
against a monthly fare:
s Usage of sports facilities;
s Maintenance and cleaning of the shared areas in the buildings
and of the green areas.
s Weekly or monthly cleaning of houses;
s Guards.
TO
VIEW THE DISTRIBUTION OF THE RESIDENTIAL PREMISES CLICK -
HERE
Area and Prices of not sold estates (Payment is made by installments
till end of construction.)
| Type of Propetry |
Size of the Property, sq.m. |
Terrace,sg.m |
Common Parts, sq.m. |
Basement |
Size of the Basement, sq.m. |
Price |
| SEKTION A |
|
|
|
|
|
|
| Floor 1 - apatments |
|
|
|
|
|
|
| 1a |
142.22 |
|
26.15 |
1ΰ |
2.95 |
162 952 |
| 2a |
89.03 |
|
16.87 |
2ΰ |
3.15 |
104 357 |
| 3a |
71.30 |
|
13.32 |
3ΰ |
3.42 |
84 503 |
| Floor 2 - apatments |
|
|
|
|
|
|
| 4a |
142.22 |
|
27.25 |
4ΰ |
2.71 |
163 864 |
| 5a |
160.06 |
|
31.58 |
5ΰ |
2.99 |
184 836 |
| Floor 3 - apatments |
|
|
|
|
|
|
| 6a |
142.22 |
|
27.39 |
6ΰ |
3.03 |
164 161 |
| 7a |
160.06 |
|
31.58 |
7ΰ |
2.30 |
184 486 |
| Floor 4 - apatments |
|
|
|
|
|
|
| 8a |
142.22 |
|
27.25 |
8ΰ |
2.42 |
163 713 |
| 9a |
160.06 |
|
31.58 |
9ΰ |
2.30 |
184 486 |
| 11α |
|
|
|
|
|
|
| Floor 5 - apatments |
|
|
|
|
|
|
| 12α |
129.31 |
177.02 |
31.51 |
10ΰ |
3.43 |
211 548 |
| Groung floor - garages |
|
|
|
|
|
|
| 1a |
20.76 |
|
3.97 |
|
|
16 025 |
| 2a |
17.74 |
|
3.40 |
|
|
13 699 |
| 3a |
20.15 |
|
3.86 |
|
|
15 558 |
| 4a |
21.61 |
|
4.14 |
|
|
16 686 |
| 5a |
17.90 |
|
3.43 |
|
|
13 822 |
| 6a |
22.79 |
|
4.36 |
|
|
17 593 |
| 7a |
20.45 |
|
3.92 |
|
|
15 792 |
| SEKTION B |
|
|
|
|
|
|
| Floor 1 - apatments |
|
|
|
|
|
|
| 1b |
67.08 |
|
12.46 |
1b |
2.88 |
79 453 |
| 2b |
63.54 |
|
11.92 |
2b |
2.38 |
75 362 |
| 3α |
67.35 |
|
12.39 |
3α |
2.90 |
79 651 |
| Floor 2 - apatments |
|
|
|
|
|
|
| 7b |
67.08 |
|
12.98 |
7b |
3.28 |
80 146 |
| 5b |
63.54 |
|
12.42 |
5b |
1.98 |
75 628 |
| 6b |
67.35 |
|
12.90 |
6b |
1.90 |
79 620 |
| Floor 3 - apatments |
|
|
|
|
|
|
| 7b |
39.46 |
|
7.41 |
7b |
1.90 |
48 256 |
| 8b |
91.31 |
|
18.02 |
8b |
1.90 |
106 943 |
| 9b |
67.35 |
|
12.90 |
9b |
1.78 |
79 557 |
| Floor 4 - apatments |
|
|
|
|
|
|
| 10b |
39.46 |
|
7.41 |
|
|
47 279 |
| 11b |
91.31 |
|
18.02 |
11b |
2.75 |
112 |
| 12b |
67.35 |
|
12.90 |
12b |
2.75 |
80 052 |
| Floor 5 - apatments |
|
|
|
|
|
|
| 3b |
105.44 |
64.02 |
22.20 |
Μΰηε 12α |
3.53 |
145 030 |
| Groung floor - garages |
|
|
|
|
|
|
| 1b |
19.72 |
|
3.78 |
|
|
15 228 |
| 2b |
18.43 |
|
3.53 |
|
|
14 230 |
| 3b |
17.72 |
|
3.39 |
|
|
13 679 |
| 4b |
18.85 |
|
3.61 |
|
|
14 554 |
| SEKTION C |
|
|
|
|
|
|
| Floor 1 - apatments |
|
|
|
|
|
|
| 1c |
65.63 |
|
11.83 |
1c |
2.47 |
77 290 |
| 2c |
70.44 |
|
13.34 |
2c |
2.47 |
83 228 |
| 3c |
71.01 |
|
13.06 |
3c |
2.47 |
83 501 |
| 4c |
67.38 |
|
12.02 |
4c |
2.42 |
79 084 |
| Floor 2 - apatments |
|
|
|
|
|
|
| 5c |
65.63 |
|
12.32 |
5c |
4.49 |
78 785 |
| 6c |
70.44 |
|
13.90 |
6c |
2.54 |
83 788 |
| 7c |
71.01 |
|
13.60 |
7c |
2.93 |
84 241 |
| 8c |
67.38 |
|
12.52 |
8c |
2.82 |
79 757 |
| Floor 3 - apatments |
|
|
|
|
|
|
| 9c |
65.63 |
|
12.32 |
9c |
2.00 |
77 507 |
| 10c |
70.44 |
|
13.90 |
10c |
2.10 |
83 565 |
| 11c |
71.01 |
|
13.60 |
11c |
1.95 |
83 741 |
| 12c |
67.38 |
|
12.52 |
12c |
2.25 |
79 466 |
| Floor 4 - apatments |
|
|
|
|
|
|
| 13c |
65.63 |
|
12.32 |
13c |
1.79 |
77 400 |
| 14c |
70.44 |
|
13.90 |
14c |
1.79 |
83 404 |
| 15c |
71.01 |
|
13.60 |
15c |
1.79 |
83 658 |
| 16c |
67.38 |
|
12.52 |
16c |
1.67 |
79 169 |
| Floor 5 - apatments |
|
|
|
|
|
|
| 17c |
87.48 |
52.85 |
18.43 |
|
|
119 306 |
| 18c |
54.95 |
84.76 |
14.15 |
|
|
94 713 |
| Groung floor - garages |
|
|
|
|
|
|
| 1c |
23.30 |
|
4.46 |
|
|
17 988 |
| 2c |
22.45 |
|
4.30 |
|
|
17 334 |
| 3c |
16.97 |
|
3.25 |
|
|
13 103 |
| 4c |
16.78 |
|
3.21 |
|
|
12 954 |
| 5c |
16.66 |
|
3.19 |
|
|
12 863 |
| 6c |
22.51 |
|
4.31 |
|
|
17 379 |
| 7c |
17.74 |
|
3.40 |
|
|
13 699 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|